eu.ESCO
About

Success stories

Read all our success stories down below:

Amtshaus Enkplatz and Amtshaus Brigittaplatz
Vienna, Austria
More
amtshaus
Challenge
  • Location: Vienna, Austria
  • Project type: Energy check
  • Number of buildings: 2
  • Type of buildings: Old
  • Construction year: 1895/1896 (Enkplatz) and 1906 (Brigittaplatz)
Solution(s)
  • Duration of the EPC contract: 1 month
  • Technical solution(s):
    • Installation of hydraulic control
    • Optimisation of hot water handling
    • Installation of thermostat valves
    • Employ communicative DDC control
    • Optimise basement heating
    • Installation of Energy-efficient lighting
    • Insulate the top floor
    • Employ speed controlled pumped
Result(s) and benefit(s)
  • Reduction of heat energy consumption of 15% (Enkplatz) and of 14% (Brigittaplatz)
  • Reduction of electrical consumption by 2%, resulting in annual costs savings of €5.450 (Enkplatz) and of €6.759 (Brigittaplatz)
  • Reduction of CO2 emissions by approximately 12%
eu.ESCO member

Siemens

Further information

Simone Alessandri (Deputy Managing Director – Head of Brussels office)
Diamant Building, Boulevard A. Reyers, 80, 1030 Brussels, Belgium
e-mail: simone.alessandri@eubac.org
Phone: +32 (0) 2 706 82 02
Fax: +32 (0) 2 706 82 10
Mobile: +32 (0) 494 88 28 26

Vellinge Community
Sweden
More
Challenge
  • Location: Vellinge, Sweden
  • Project type: EPC
Solution(s)
  • Technical solution(s):
    • Desigo PX and Desigo Insight
    • Lighting
    • HVAC installation
    • Change heat production systems
    • Plumbing
    • Water savings
    • Isolation
    • Heat pump installations
    • Balance of hydraulic systems
    • Online live energy analysis over the Advantage OperationsCentre
  • Non-technical solution(s):
    • Education of users
Result(s) and benefit(s)
  • Modernised buildings without investment
  • Reduction of CO2 emissions by 20%
  • Guaranteed savings of €110.000 per year
  • Facilities are constantly monitored and optimised by Siemens over the Advatage Operation Center
eu.ESCO member

Siemens

Further information

Simone Alessandri (Deputy Managing Director – Head of Brussels office)
Diamant Building, Boulevard A. Reyers, 80, 1030 Brussels, Belgium
e-mail: simone.alessandri@eubac.org
Phone: +32 (0) 2 706 82 02
Fax: +32 (0) 2 706 82 10
Mobile: +32 (0) 494 88 28 26

City of Salzburg
Austria
More
Challenge
  • Location: Salzburg, Austria
  • Project type: EPC
  • Number of buildings: 120
Solution(s)
  • Technical solution(s):
    • Monitoring and controlling
    • 1.800 energy meters
    • 2 management stations featuring DESIGO INSIGHT and Consumption Control
Result(s) and benefit(s)
  • Calculated energy cost savings of €255.000 annually
  • Other benefit(s):
    • Higher plant capacity, secured value and profitability due to monitoring and controlling
    • Sustainable quality assurance and budget reduction due to energy management
    • Regular consumption, costs and emissions reports accessible in a harmonised format
    • Simplified monitoring for guarantee control in all projects, independent of the performance contracting partner
    • Implementation of environmental policy goals
eu.ESCO member

Siemens

Further information

Simone Alessandri (Deputy Managing Director – Head of Brussels office)
Diamant Building, Boulevard A. Reyers, 80, 1030 Brussels, Belgium
e-mail: simone.alessandri@eubac.org
Phone: +32 (0) 2 706 82 02
Fax: +32 (0) 2 706 82 10
Mobile: +32 (0) 494 88 28 26

Municipality of Oberstdorf
Germany
More
Challenge
  • Location: Oberstdorf, Germany
  • Project type: EPC
  • Type of buildings: Fire station and several schools
Solution(s)
  • Duration of the EPC contract: 14 years
  • Technical solution(s):
    • Installation of user-friendly Desigo controller
    • Installation of heating facilities enabling efficient use of the control technology
Result(s) and benefit(s)
  • Guaranteed annual savings of €27.500 (25%)
  • Annual reduction of CO2 emissions of 224 tonnes
eu.ESCO member

Siemens

Further information

Simone Alessandri (Deputy Managing Director – Head of Brussels office)
Diamant Building, Boulevard A. Reyers, 80, 1030 Brussels, Belgium
e-mail: simone.alessandri@eubac.org
Phone: +32 (0) 2 706 82 02
Fax: +32 (0) 2 706 82 10
Mobile: +32 (0) 494 88 28 26

Municipality of Raabs an der Thaya
Austria
More
Challenge
  • Location: Municipality of Raabs an der Thaya, Austria
  • Project type: EPC
  • Type of buildings: Swimming pool, primary school, kindergarten, town house and street lights
Solution(s)
  • Technical solution(s):
    • Renovation of ventilation plants
    • Heat recovery
    • Optimisation of hot water handling, lighting and individual room control
    • Demand-controlled heating
    • Various maintenance work
    • Use of energy-efficient lighting (mercury lamps) in street lamps
Result(s) and benefit(s)
  • Comfort increase
  • Reduction of CO2 emissions by 20%
  • Guaranteed savings of €16.307 per year
eu.ESCO member

Siemens

Further information

Simone Alessandri (Deputy Managing Director – Head of Brussels office)
Diamant Building, Boulevard A. Reyers, 80, 1030 Brussels, Belgium
e-mail: simone.alessandri@eubac.org
Phone: +32 (0) 2 706 82 02
Fax: +32 (0) 2 706 82 10
Mobile: +32 (0) 494 88 28 26

Municipal Authority of Marchtrenk
Austria
More
Challenge
  • Location: Marchtrenk, Austria
  • Project type: EPC
  • Number of buildings: 4
  • Type of buildings: Dr. Schärf Primary School (3.204 m²), Dr. Körner Dual Secondary School (7.957 m²), Lindenstrasse Lindergarten (928 m²) and Goethestrasse community center (2.028 m²)
Solution(s)
  • Duration of the EPC contract: 6 years
  • Technical solution(s):
    • Replacement of boilers and gas burners
    • Fuel change from oil to gas
    • Energy management system
    • Replacement of all actuators and controllers
    • Installation of the UNIGYR digital control system of Siemens Building Automation
    • Installation of balancing valves
    • Replacement of electrical control panels (heating/ventilation)
    • Energy controlling using Consumption Control
Result(s) and benefit(s)
  • Energy costs before EPC: €90.841
  • Energy costs after application of measures: €64.539
  • Reduction of CO2 emissions by 211 tonnes per annum
  • Forecasted savings on energy of 29 %
eu.ESCO member

Siemens

Further information

Simone Alessandri (Deputy Managing Director – Head of Brussels office)
Diamant Building, Boulevard A. Reyers, 80, 1030 Brussels, Belgium
e-mail: simone.alessandri@eubac.org
Phone: +32 (0) 2 706 82 02
Fax: +32 (0) 2 706 82 10
Mobile: +32 (0) 494 88 28 26

Federal Schools
Federal State of Lower Austria
More
Challenge
  • Location: Federal State of Lower Austria
  • Project type: EPC
  • Number of buildings: 38
  • Type of buildings: Federal schools
Solution(s)
  • Technical solution(s):
    • New regulation and control systems
    • Single room control
    • Far circuit entering of the regulation system
    • Application of reference detectors and thermostats
    • Hydraulic equipment
    • Damping and insulation of the windows
    • Condensing boiler and exhaust chiller
    • Heating pumps and solar plants
    • Heat recovery at ventilation systems
    • Optimising of the ventilation systems
    • Energy saving lamps
    • Time switch towards stand-by
    • Energy counter
  • Non-technical solutions:
    • Project “user motivation for energy-conscious behaviour”
Result(s) and benefit(s)
  • Reduction of the energy costs, cut of the high maintenance efforts
  • Annual energy costs before modernisation of €3,12m
  • Guaranteed annual cost savings of €722.330 (23.15%)
  • Reduction of annual CO2 emissions of 2.880 tonnes
eu.ESCO member

Siemens

Further information

Simone Alessandri (Deputy Managing Director – Head of Brussels office)
Diamant Building, Boulevard A. Reyers, 80, 1030 Brussels, Belgium
e-mail: simone.alessandri@eubac.org
Phone: +32 (0) 2 706 82 02
Fax: +32 (0) 2 706 82 10
Mobile: +32 (0) 494 88 28 26

County Council of Östergotland
Sweden
More
Challenge
  • Location: County council Östergotland, Sweden
  • Project type: EPC
  • Number of buildings: 189
Solution(s)
  • Duration of the EPC contract: 9 years
  • Technical solution(s):
    • Replacement of oil boiler by a heat pump (health centre Brinken)
    • Replacement of oil-fired boilers by pellet boilers (Vreta School and health centre Blairgowrie)
Result(s) and benefit(s)
  • Reduction of CO2 emissions by 2.307 tonnes/year
  • Reduction of emissions of NOx: 2.922 kg/year and SOx: 1.463 kg/year
  • Guaranteed savings of 16.038 MWh/year or 30 kWh/m2 year
  • Guaranteed savings of 29.000 m3/year of water
  • Guaranteed savings of €800.000 annually
  • Additional savings on maintenance of €7.35m in 15 years
eu.ESCO member

Siemens

Further information

Simone Alessandri (Deputy Managing Director – Head of Brussels office)
Diamant Building, Boulevard A. Reyers, 80, 1030 Brussels, Belgium
e-mail: simone.alessandri@eubac.org
Phone: +32 (0) 2 706 82 02
Fax: +32 (0) 2 706 82 10
Mobile: +32 (0) 494 88 28 26

Public Swimming Pools
Berlin, Germany
More
Challenge
  • Location: Berlin, Germany
  • Project type: EPC
  • Number of buildings: 11
  • Type of buildings: Public swimming pools
Solution(s)
  • Duration of the EPC contract: 10 years
  • Technical solution(s):
    • Modernisation of the heating, ventilation and air conditioning systems as well as domestic hot water, water treatment technology and lighting
    • Improvement on the water hygiene as well as the change from water chlorination to more environmentally and more skin-friendly method
Result(s) and benefit(s)
  • Guaranteed annual savings of €1.63m (33,5%)
  • Annual reduction of CO2 emissions of 5.000 tonnes
eu.ESCO member

Siemens

Further information

Simone Alessandri (Deputy Managing Director – Head of Brussels office)
Diamant Building, Boulevard A. Reyers, 80, 1030 Brussels, Belgium
e-mail: simone.alessandri@eubac.org
Phone: +32 (0) 2 706 82 02
Fax: +32 (0) 2 706 82 10
Mobile: +32 (0) 494 88 28 26

State of Berlin
Germany
More
Challenge
  • Location: Berlin, Germany
  • Project type: EPC
  • Number of buildings: 164
  • Type of buildings: Schools, kindergartens, day-care centres, sport facilities (gyms and indoor swimming pools), JVA Tegel correctional facility, Universities (Technical University of Berlin and Berlin University of the Arts)
Solution(s)
  • Duration of the EPC contract: 12 years
  • Technical solution(s):
    • Development and realisation of an energy efficiency concept
    • Regulation of heat generation/distribution
    • Renewal of air conditioning and ventilation technology
    • Replacement of lighting systems
    • Installation of water technology
    • Controlling, monitoring and maintenance measures
Result(s) and benefit(s)
  • 1.14m immediate budgetary reduction annually for Berlin
  • €5.3m guaranteed energy cost savings annually
  • €47.7 – €63.6m guaranteed savings for Berlin over contract period
  • 29.000 tonnes/year reduction in CO? emissions annually (25%)
  • Other benefit(s):
    • Guaranteed energy cost savings during the entire contractperiod
    • Energy savings immediately releases budget for other projects
    • No in-house investments for energy saving measures
    • One partner responsible for planning, execution and maintenance
    • Lower transaction costs through building pools
    • Customer assumes ownership of energy-optimised plants after expiration of contract without additional compensation
eu.ESCO member

Siemens

Further information

Simone Alessandri (Deputy Managing Director – Head of Brussels office)
Diamant Building, Boulevard A. Reyers, 80, 1030 Brussels, Belgium
e-mail: simone.alessandri@eubac.org
Phone: +32 (0) 2 706 82 02
Fax: +32 (0) 2 706 82 10
Mobile: +32 (0) 494 88 28 26

Municipality of Amstetten
Austria
More
Challenge
  • Location: Amstetten, Austria
  • Project type: EPC
  • Number of buildings: 27
Solution(s)
  • Duration of the EPC contract: 10 years
  • Technical solution(s):
    • Boiler upgrade
    • Solar collectors for domestic hot water at the stadium
    • Upgrade control technology
    • Rebuild hydraulic systems (distributors, pumps, etc.)
    • Window insulation, replacement
    • Partial upgrade of lighting systems
    • Adding meters and energy management
  • Non-technical solution(s):
    • Environmental awareness trough User motivation in schools and kindergarten
Result(s) and benefit(s)
  • Energy costs before modernisation: €355.000
  • Guaranteed energy costs savings: €75.000 p.a.
  • Reduction of CO2 emissions: 25% p.a.
  • Investment: €735.000
eu.ESCO member

Siemens

Further information

Simone Alessandri (Deputy Managing Director – Head of Brussels office)
Diamant Building, Boulevard A. Reyers, 80, 1030 Brussels, Belgium
e-mail: simone.alessandri@eubac.org
Phone: +32 (0) 2 706 82 02
Fax: +32 (0) 2 706 82 10
Mobile: +32 (0) 494 88 28 26

University of Sheffield
The United Kingdom
More
Challenge
  • Location: Sheffield, United Kingdom
  • Project type: EPC
  • Number of buildings: 38
  • Type of buildings: Old
  • Construction year: Different years
Solution(s)
  • Duration of the EPC contract: 10 years
  • Technical solution(s):
    • Installation of chilled water system
    • Upgrading of Air Handling Units (AHU)
    • Retrofitting of heat distribution and district heating
    • Installation of energy efficient lighting systems
    • Conservation of domestic water
    • Installation of automatic water treatment
  • Non-technical solution(s):
    • Education
Result(s) and benefit(s)
  • Reduction of >25% energy consumption per year
  • Reduction of 1.68m kg of CO2 emissions per year
  • Other benefit(s):
    • Eradicate over €1,2m of backlog maintenance
    • Reduced reactive maintenance costs by €289.000
eu.ESCO member

Schneider Electric

Further information

Simone Alessandri (Deputy Managing Director – Head of Brussels office)
Diamant Building, Boulevard A. Reyers, 80, 1030 Brussels, Belgium
e-mail: simone.alessandri@eubac.org
Phone: +32 (0) 2 706 82 02
Fax: +32 (0) 2 706 82 10
Mobile: +32 (0) 494 88 28 26

Nyköpingshem
Nyköping, Sweden
More
Challenge
  • Location: Nyköping municipality, Sweden
  • Project type: EPC
  • Number of buildings: 64
  • Type of buildings: Old
  • Construction year: Different years
Solution(s)
  • Technical solution(s):
    • Balancing of heating and ventilation system
    • Ground source heat pumps
    • New BS system
    • Optimisation of their energy system overall
  • Non-technical solution(s):
    • Education
Result(s) and benefit(s)
  • Reduction of 20% of energy consumption per year
  • Reduction of approximately 20% of CO2 emissions per year
eu.ESCO member

Schneider Electric

Further information

Simone Alessandri (Deputy Managing Director – Head of Brussels office)
Diamant Building, Boulevard A. Reyers, 80, 1030 Brussels, Belgium
e-mail: simone.alessandri@eubac.org
Phone: +32 (0) 2 706 82 02
Fax: +32 (0) 2 706 82 10
Mobile: +32 (0) 494 88 28 26

Middelfart Municipality
Denmark
More
Challenge
  • Location: Middelfart Municipality, Denmark
  • Project type: EPC
  • Number of buildings: 100
  • Type of buildings: Old
Solution(s)
  • Technical solutions:
    • Improvement of indoor climate
    • Installation of better controls
    • Reduction of reactive maintenance
Result(s) and benefit(s)
  • 20% savings in direct energy
eu.ESCO member

Schneider Electric

Further information

Simone Alessandri (Deputy Managing Director – Head of Brussels office)
Diamant Building, Boulevard A. Reyers, 80, 1030 Brussels, Belgium
e-mail: simone.alessandri@eubac.org
Phone: +32 (0) 2 706 82 02
Fax: +32 (0) 2 706 82 10
Mobile: +32 (0) 494 88 28 26

Kerteminde Municipality
Denmark
More
Challenge
  • Location: Kerteminde Municipality, Denmark
  • Project type: EPC
  • Number of buildings: 60
  • Type of buildings: Old
Solution(s)
  • Technical solutions:
    • Installation of a Building Management System
    • Reduction of reactive maintenance
    • Installation of better controls
    • Implementation of the Performance Assurance Support Services (PASS)
Result(s) and benefit(s)
  • 25% direct savings on heat
eu.ESCO member

Schneider Electric

Further information

Simone Alessandri (Deputy Managing Director – Head of Brussels office)
Diamant Building, Boulevard A. Reyers, 80, 1030 Brussels, Belgium
e-mail: simone.alessandri@eubac.org
Phone: +32 (0) 2 706 82 02
Fax: +32 (0) 2 706 82 10
Mobile: +32 (0) 494 88 28 26

Hoeje-Taastrup Municipality
Denmark
More
Challenge
  • Location: Hoeje?Taastrup Municipality, Denmark
  • Project type: EPC
  • Number of buildings: 260
  • Type of buildings: Mix of old and new buildings
  • Construction year: Different years
Solution(s)
  • Technical solution(s):
    • Renovation of the ventilation system, lighting system, BMS system and the climate shell
    • Eradicate all backlog maintenance in the project, which otherwise would have strained the budget for building investments
    • Target bad indoor climate factors, which will benefit children, residents and employees within the municipality
    • Implemented one of the largest PV installation sites in Denmark (800 m2)
  • Non-technical solution(s):
    • Education
Result(s) and benefit(s)
  • Reduction of approximately 15% of energy consumption per year
  • Reduction of 15% of CO2 emissions per year
eu.ESCO member

Schneider Electric

Further information

Simone Alessandri (Deputy Managing Director – Head of Brussels office)
Diamant Building, Boulevard A. Reyers, 80, 1030 Brussels, Belgium
e-mail: simone.alessandri@eubac.org
Phone: +32 (0) 2 706 82 02
Fax: +32 (0) 2 706 82 10
Mobile: +32 (0) 494 88 28 26

Waldfriede Hospital
Berlin, Germany
More
Challenge
  • Location: Berlin, Germany
  • Project type: EPC
  • Number of buildings: 2
  • Type of buildings:
    • 1 building complex dating from 1920
    • 1 building complex dating from 1980
Solution(s)
  • Duration of the EPC contract: 12 years
  • Technical solutions:
    • Installation of Building Management System (BMS) / changeover to Direct Digital Control (DDC)
    • Implementation of energy management and controls systems
    • Retrofitting of the central heating station (fuel conversion from oil to gas, installation of new efficient boilers and burners)
    • Optimisation of heating plans including hydraulic adjustment, installation of efficient pumps and valves
    • Installation of presence detectors to cut energy consumption when rooms are not occupied
    • Retrofitting of switchboards
    • Installation of water saving fittings
    • Replacement of water-cooled condensers by air-cooled condensers
  • Non-technical solutions:
    • Training of technical staff
Result(s) and benefit(s)
  • 22% savings in energy costs
  • 40% CO2 emissions reduction
eu.ESCO member

Johnson Controls

Further information

Simone Alessandri (Deputy Managing Director – Head of Brussels office)
Diamant Building, Boulevard A. Reyers, 80, 1030 Brussels, Belgium
e-mail: simone.alessandri@eubac.org
Phone: +32 (0) 2 706 82 02
Fax: +32 (0) 2 706 82 10
Mobile: +32 (0) 494 88 28 26

Meander Medical Centre
Meander, The Netherlands
More
Challenge
  • Location: Baarn, The Netherlands
  • Project type: EPC
  • Number of buildings: 1
  • Type of buildings: Building dates from the 1970s
Solution(s)
  • Duration of the EPC contract: 7 years
  • Technical solution(s):
    • The replacement of the conventional boiler by a high efficiency condensing boiler
    • The adaptation of the steam boiler system to the current steam demand needed for humification
    • The replacement of the R22 chiller with a high efficient and more performant chiller
    • The replacement of current fixed flow pumps with high efficiencyvariable flow pumps in order to meet the variable heating demands over different seasons
    • The installation of a controls system to monitor the lighting and other electric devices based on motion sensors and time schedules
Result(s) and benefit(s)
  • 24% energy cost reduction per year
  • 29% CO2 emissions reduction
  • Other benefit(s): Long term benefits: energy and resource savingscontribute to patients’, visitors’ and staff’s well-being
eu.ESCO member

Johnson Controls

Further information

Simone Alessandri (Deputy Managing Director – Head of Brussels office)
Diamant Building, Boulevard A. Reyers, 80, 1030 Brussels, Belgium
e-mail: simone.alessandri@eubac.org
Phone: +32 (0) 2 706 82 02
Fax: +32 (0) 2 706 82 10
Mobile: +32 (0) 494 88 28 26

Community of Hude
Germany
More
Challenge
  • Location: Hude, Germany
  • Project type: EPC
  • Number of buildings: 9
  • Type of buildings: Public buildings, including 4 schools and 1 town hall
Solution(s)
  • Duration of the EPC contract: 12 years
  • Technical solution(s):
    • Installation of a new heating and building control system in one of the schools
    • Installation of new metering systems for electricity and gas, optimisation of control systems and lighting across all of the properties
    • Installation of new integrated building management system including interfaces to existing systems and installation of data displays
    • Optimisation of heat distribution, installation of a new hot water boiler and decentralisation of potable hot water production
    • Improvement of the lighting systems
Result(s) and benefit(s)
  • Cut energy costs from €213.000 to €182.000 annually through a €250.000 investment
  • Budget relief for Hude thanks to share on savings
  • CO2 emissions reduction of 128 tonnes/year
eu.ESCO member

Johnson Controls

Further information

Simone Alessandri (Deputy Managing Director – Head of Brussels office)
Diamant Building, Boulevard A. Reyers, 80, 1030 Brussels, Belgium
e-mail: simone.alessandri@eubac.org
Phone: +32 (0) 2 706 82 02
Fax: +32 (0) 2 706 82 10
Mobile: +32 (0) 494 88 28 26

Oranienstein Base
Diez, Germany
More
Challenge
  • Location: Diez, Germany
  • Project type: EPC
  • Number of buildings: 37.000 m2 army base site with different buildings
  • Type of buildings: Different buildings including castle built in the 17th century
Solution(s)
  • Duration of the EPC contract: 10 years
  • Technical solution(s):
    • Replacement of a 850kW dual fuel boiler with a woodchip boiler.
    • Installation of two mini gas fired combined heat and power plants (CHP)
    • Construction of a gas pipeline for CHP
    • Change of warm water supply in several buildings.
    • Installation of a central water-softening plant
    • Replacement of the lighting system
    • Installation of meters and the modernisation of the Building Management System
    • Change of the pump control to pressure control
    • Installation of M-bus meters
    • Optimisation of Direct Digital Controls (DDC)
Result(s) and benefit(s)
  • 49% savings in annual energy costs
  • 55% reduction of CO2 emissions
eu.ESCO member

Johnson Controls

Further information

Simone Alessandri (Deputy Managing Director – Head of Brussels office)
Diamant Building, Boulevard A. Reyers, 80, 1030 Brussels, Belgium
e-mail: simone.alessandri@eubac.org
Phone: +32 (0) 2 706 82 02
Fax: +32 (0) 2 706 82 10
Mobile: +32 (0) 494 88 28 26

Hapimag Resort
Winterberg, Germany
More
Challenge
  • Location: Winterberg, Germany
  • Project type: EPC
  • Number of buildings: 190 holiday apartments dating from 1994
  • Type of buildings: Old
Solution(s)
  • Technical solution(s):
    • Installation and use of a combined heat and power station
    • Modernisation and optimisation of the ventilation and control equipment in the swimming pool complex
Result(s) and benefit(s)
  • Reduction of 110 tonnes CO2 emissions per year
eu.ESCO member

Honeywell

Further information

Simone Alessandri (Deputy Managing Director – Head of Brussels office)
Diamant Building, Boulevard A. Reyers, 80, 1030 Brussels, Belgium
e-mail: simone.alessandri@eubac.org
Phone: +32 (0) 2 706 82 02
Fax: +32 (0) 2 706 82 10
Mobile: +32 (0) 494 88 28 26

Clinical Centre
Landshut, Germany
More
Challenge
  • Location: Landshut, Germany
  • Project type: EPC
Solution(s)
  • Technical solutions:
    • Renovation of the Building Management System (BMS)
    • Replacement of two heating boilers with a new condensing boiler
    • Installation of a wood chip furnace
    • Reduction of hot water temperature (110 °C to 90 °C)
    • Adjustment of the temperature range on the remaining boiler via the BMS and burner (now used as a back-up boiler)
    • Construction of a new boiler house that was integrated into the existing hydraulic system through a buffer
    • Modernisation of the existing Direct Digital Control (DDC)
    • Installation of an energy manager
    • Re-programming of the control algorithms
    • Installation of new energy-efficient supply exhaust fans and motors
    • Pre-definition of the load profile to ensure energy-optimised operation
Result(s) and benefit(s)
eu.ESCO member

Honeywell

Further information

Simone Alessandri (Deputy Managing Director – Head of Brussels office)
Diamant Building, Boulevard A. Reyers, 80, 1030 Brussels, Belgium
e-mail: simone.alessandri@eubac.org
Phone: +32 (0) 2 706 82 02
Fax: +32 (0) 2 706 82 10
Mobile: +32 (0) 494 88 28 26